| 
|
Flowsheet
Issue 13 (October 2001)
Download Flowsheet Issue
13 (PDF)
Contents:
- Stress relief for nickel
When nickel metal produced by electrolysis becomes highly stressed,
it literally cracks under the pressure. The nickel deposit fractures
and peels from the surface of the electrode on which it has plated.
A stressed out nickel deposit is a major problem...
- Tackling the problem of scale
Scale in industry is to equipment surfaces and pipes what barnacles
are to ships. Barnacles attached to hulls reduce the efficiency of ships,
are expensive to remove and take ships out of service while they are
cleaned off. Scale - unwanted mineral deposits - can result in...
- Playing with a model of gold adsorption onto
activated carbon
By playing with a computer model she has built, Sawan Jongpaiboonkit
will actually be working - working to investigate different strategies
for managing carbon...
- Hydrometallurgy facility open for business
The Parker Centre's new hydrometallurgy facility is already being put
to good use by its first occupant, Perth company HiTec Energy Ltd. HiTec
Energy is operating a demonstration plant in the facility...
|